貨物裝運(yùn)規(guī)格-中英版
在裝運(yùn)時(shí),要特別注意配電盤(pán)及控制面板的包裝以防潮氣進(jìn)入。除非工程師另行同意,一般保護(hù)措施應(yīng)包括將設(shè)備裝入一個(gè)0.13毫米厚密封的聚乙烯袋及硅膠或其他經(jīng)批準(zhǔn)的空氣干燥器內(nèi),并將多余的空氣抽出,使得聚乙烯袋能夠緊貼裝置的外部輪廓。
電動(dòng)電機(jī)(或類(lèi)似設(shè)備)運(yùn)輸時(shí),電機(jī)應(yīng)上鎖以防軸承在運(yùn)輸過(guò)程中因震動(dòng)受損。
管路包裝的設(shè)計(jì)旨在避免任何表面凹陷或者圓度受損。
所有的包裝都應(yīng)該使用識(shí)別編號(hào)清楚而顯著地標(biāo)記。標(biāo)記內(nèi)容應(yīng)包含雇主參考號(hào)以及承包商的標(biāo)記。
2.20.2運(yùn)輸
承包商應(yīng)負(fù)責(zé)將設(shè)備運(yùn)抵施工現(xiàn)場(chǎng),包括其操作及保管。在某些特定情況下,設(shè)備的運(yùn)輸還包括以下任何一項(xiàng)或全部,但不限于此:
通過(guò)海運(yùn),陸運(yùn)或空運(yùn)的方式裝載并運(yùn)送設(shè)備,包括保險(xiǎn)。
負(fù)責(zé)設(shè)備在柬埔寨港口或鐵路或機(jī)場(chǎng)服務(wù)站入口處的相關(guān)費(fèi)用,包括港口費(fèi)、碼頭費(fèi)、逾期費(fèi)、中轉(zhuǎn)存儲(chǔ)費(fèi)、終點(diǎn)裝卸費(fèi)、施工現(xiàn)場(chǎng)的再裝載轉(zhuǎn)運(yùn)費(fèi)。
將設(shè)備運(yùn)輸至施工現(xiàn)場(chǎng),卸載并臨時(shí)儲(chǔ)存至倉(cāng)庫(kù)或使用遮蓋放置,直到工程要求安裝。
承包商應(yīng)盡可能在港口或者航空或鐵路終端詳細(xì)檢查設(shè)備,再運(yùn)達(dá)施工現(xiàn)場(chǎng)。承包商一旦發(fā)現(xiàn)設(shè)備在運(yùn)輸時(shí)受損或被破壞,應(yīng)立即通知工程師,由其檢查設(shè)備并給出更換或維修的指令。
承包商應(yīng)在施工現(xiàn)場(chǎng)準(zhǔn)備一個(gè)臨時(shí)的存儲(chǔ)區(qū)域,F(xiàn)場(chǎng)安排及存儲(chǔ)條件都必須經(jīng)工程師審批。工程師將隨時(shí)檢查承包商準(zhǔn)備的臨時(shí)存儲(chǔ)區(qū)域。沒(méi)有正確存放,受損的或者被腐蝕的物品將被做上標(biāo)記,且由承包商負(fù)責(zé)起更換的費(fèi)用。承包商在運(yùn)輸付款過(guò)程結(jié)束后,仍應(yīng)對(duì)設(shè)備的存儲(chǔ)全權(quán)負(fù)責(zé)。
工程師認(rèn)為不合格的設(shè)備都必須立即移除,并由承包商負(fù)責(zé)更換。
2.20.3Storage 存儲(chǔ)
承包商應(yīng)根據(jù)制造商的建議為所有設(shè)備提供安全,合適的存儲(chǔ)地點(diǎn),設(shè)備存儲(chǔ)要考慮溫度、雨水、陽(yáng)光,風(fēng)及地面條件等。
存儲(chǔ)的設(shè)備由承包商規(guī)劃放置,方便其在日后根據(jù)項(xiàng)目的需要重新使用。
支架上堆放的設(shè)備應(yīng)防止因隔板所造成的損壞,并安全擺放。金屬制品不得直接堆放在地上。
小物品可直接放入合適的大儲(chǔ)藏箱,盒子或抽屜內(nèi),用標(biāo)簽清楚標(biāo)記。
小心處理并存儲(chǔ)設(shè)備以便其不受過(guò)度應(yīng)力的擠壓,保護(hù)其包裝不被損壞。
承包商對(duì)于吊索,鏈條及掛鉤的使用與放置應(yīng)符合制造商的包裝及設(shè)備標(biāo)記的要求。
承包商應(yīng)有一本庫(kù)存帳,有需要時(shí)可對(duì)存儲(chǔ)物進(jìn)行查詢,評(píng)判。
入口處僅限于存放原水主輸送管道所需的管道, PPWSA(金邊供水管理局)將在水處理廠內(nèi)劃出一塊回填區(qū)域作為管道儲(chǔ)存之用。承包商應(yīng)負(fù)責(zé)圍欄以及存儲(chǔ)區(qū)的準(zhǔn)備工作,包括進(jìn)入該區(qū)域的通道。
2.21性能擔(dān)保
承包商應(yīng)擔(dān)保每臺(tái)設(shè)備都能具備令人,設(shè)備的整體性能良好能夠生產(chǎn)出指定質(zhì)量的原水,并達(dá)到泵送及運(yùn)輸?shù)囊蟆?/p>
承包商還應(yīng)擔(dān)保項(xiàng)目清單所列的各項(xiàng)細(xì)節(jié)情況屬實(shí)。
如果所擔(dān)保的性能未達(dá)成,承包商有必要對(duì)設(shè)備做出修改或更換以達(dá)到理想的性能。
2.22拍照
承包商應(yīng)在工程開(kāi)始之前現(xiàn)場(chǎng)安排照相,隨后根據(jù)工程師代表的要求提供JPEG格式的文件。承包商應(yīng)承諾在未經(jīng)雇主允許的情況下,不得將任何文件或打印文件做其他用途使用。承包商還應(yīng)保證現(xiàn)場(chǎng)不得出現(xiàn)未經(jīng)授權(quán)的攝影師。
Shipment Specification
In case of shipment, it is important to pay special attention to the switchboard and packaging to prevent moisture into the control panel. Otherwise agreed by the engineer, general protection measures shall include the equipment into an airtight polyethylene bag and silicone or other approved air dryer with the thickness of 0.13mm, and take out the excess air, so as to enable the polyethylene bag to close to the device's external contours (or similar device) transport of the electric motor. The motor shall be locked to prevent bearing damage due to vibration in transit.
Line packaging designed to avoid any damaged surface concave or roundness.
All packaging shall be used to identify Numbers clearly and significantly. Tag content shall include the employer reference number tags and contractors.
2.20.2 Transportation
Contractor shall be responsible for the equipment to the construction site, including its operating and keeping. In certain cases, the transport equipment includes all or any of the following items, but not limited to this:
By sea, land or air way of loading and transportation equipment, including insurance.
Contractor shall be responsible for equipment in the port or airport or railway station at the entrance of relevant expenses, including port charge, dock fee, demurrage, transit storage fee, terminal handling charge, then load transfer cost of the construction site.
To transport equipment to the construction site, unloading and temporary storage to warehouse or use hiding place, until the installation engineering requirements.
Contractor shall, as far as possible in the port or air or rail terminal inspection equipment in detail, then transport to the construction site. The contractor once found equipment damaged or destroyed during transport, immediate notice must be given to the engineer, by him to inspect the equipment and give replacement or repair instructions.
Contractor shall at the construction site to prepare a temporary storage area. The arrangement and storage conditions must be approved by the engineer. Engineers will check the contractor temporary storage area. No stored properly, damaged or corroded items will be marked, and the contractor is responsible for the replacement cost. After the contractor in the transport process of payment, is responsible for equipment storage full.
Engineers think unqualified equipment must be immediately removed, and the contractor is responsible for the replacement.
2.20.3 Storage
Contractor shall provide a safe, proper storage location, equipment storage to consider the temperature, rain, sunshine, and wind and ground conditions according to the manufacturer's recommendations for all equipment.
Storage equipment shall be arranged by contractors planning place, convenient and according to the project need to use in the future.
Stacked on a support equipment caused by partition shall guard against the damage, and safe to put. Metal products shall not be stored directly on the floor.
Small items can be directly into the appropriate storage box, box or drawer, clearly marked with the tag.
Careful handling and storage device so that it is not subject to excessive stress extrusion, protect its packaging is not damaged.
Contractors for sling, chain and hook with place shall comply with the manufacturer's packaging and use of equipment marking requirements.
The contractor shall have an inventory account, when necessary, can of the stored query, judge.
The entrance is limited to store raw water required for the main pipeline pipe, produces (phnom penh water supply authority) will create a backfilling area in water treatment plant as the pipeline storage. The contractor shall be responsible for the fence and the preparation of storage area, including the channel into the area.
2.21 Performance guarantee
The contractor shall guarantee each device can have a, the equipment the overall performance of the good to produce the specified quality of raw water, and to achieve the requirement of the pump and transport.
Contractor shall also guarantee the details of the case listed project list.
If the guarantee is not reached, the performance of the contractor equipment modification or replacement is necessary in order to achieve the ideal performance.
2.22 Taking photos
Contractor shall arrange photo before the start of the project site, then according to the requirement of the engineer's representative to provide JPEG files. Contractor shall promise without the permission of the employer, shall not be any file or print documents for other purposes. Contractor shall also ensure that the site may not appear unauthorized photographer.